The Aspen airport closure in 2027

No flights of any kind will land at ASE from April 4 to November 19, 2027. How to get to Aspen instead, and what that changes for a summer or autumn trip.

From 11:00 p.m. on Sunday, April 4, 2027 until 7:00 p.m. on Friday, November 19, 2027, Aspen/Pitkin County Airport is closed while its runway is rebuilt. That includes private jets: the airport has said no commercial or general aviation flights will operate and the terminal will be shut.

For about seven and a half months, every arrival to Aspen becomes a drive from another airport. That is manageable, but it changes the plan more than most people expect, especially in summer, when Glenwood Canyon on I-70 is also under construction. Here is how we are planning 2027 arrivals for the people we look after.

Paul Montiel  ·  Aspen  ·  Updated September 2026

IAt a Glance

What changes in 2027

Closed
April 4, 2027, 11:00 p.m. — November 19, 2027, 7:00 p.m.Aspen/Pitkin County Airport, official announcement (May 2026).
Who it affects
Everyone. Airlines, private jets and charters alike.No commercial or general aviation operations, no terminal access.
Why
A full runway rebuild to current FAA standards, plus work on a new terminal and FBO.The new terminal is scheduled for 2029; flights resume from the existing terminal in late November 2027.
After reopening
Larger private jets can use Aspen.The current 95-foot wingspan limit is set to rise to 118 feet with the new runway.
IIWhich Airport Instead

The four realistic ways in

0h1h2h3h4hASEAspenClosed Apr 4 – Nov 19, 2027RILRifle1h15EGEEagle1h30GJTGrand Junction2h15DENDenver3.5–4h
Approximate drive to Aspen in normal conditions. Hatched: the route runs through Glenwood Canyon, under construction May–October 2027. Solid: avoids the canyon.
EGE
Eagle County · about 90 minutes

The main airline alternative. Summer 2027 service is scheduled to grow from 46 to 112 weekly flights, with United and American adding Denver, Dallas, Chicago, Houston and Los Angeles. The road to Aspen runs through Glenwood Canyon.

RIL
Rifle Garfield County · about 1 hr 15

Our first choice for private aircraft. No airline traffic, open around the clock, a 7,000-foot runway at a lower elevation than Aspen, and the drive to Aspen avoids Glenwood Canyon entirely.

GJT
Grand Junction · about 2 hr 15

More airline options and larger aircraft, and like Rifle it sits west of Glenwood Canyon. A longer transfer, but a predictable one during the canyon roadwork.

DEN
Denver · 3½–4 hrs

The most flights and usually the best fares. In summer, Independence Pass is normally open, which avoids the canyon; from April 4 until the pass reopens in late May, the only route is I-70 through Glenwood Springs.

IIIThe Part Most Guides Miss

Glenwood Canyon is under construction at the same time

From May through October 2027, the Colorado Department of Transportation is repairing I-70 through Glenwood Canyon between No Name and Hanging Lake, with traffic running head-to-head. The drive from Eagle and the drive from Denver both pass through that stretch.

CDOT has asked travellers heading to Aspen from the east to avoid the peaks: Thursday and Friday afternoons westbound and weekday mornings eastbound. Those are exactly the hours many weekend guests fly in and out.

That is why, for summer and autumn 2027, we look at Rifle and Grand Junction first for anyone who can use them, and time Eagle and Denver transfers around the canyon rather than the flight alone.

IVPlanning a 2027 Trip

What we would do, by season

Early April

The last weeks of the ski season overlap the closure. Arrivals after April 4 come via Eagle or Denver, and Independence Pass is still closed, so the Denver route is I-70 through Glenwood Springs, roughly four hours.

Summer

Food & Wine, the Ideas Festival, the Music Festival and the August calendar all fall inside the closure. Book Eagle seats early, consider Rifle for private flights, and plan Thursday and Friday arrivals around the canyon hours.

Autumn

September colour and October quiet are still easy trips; the canyon roadwork runs through October, so the same timing rules apply.

Late November

Flights resume from 7:00 p.m. on November 19. For the start of the 2027–28 ski season, expect a busy first weekend back and book arrival transport early.

Private aviation

Plan the ground leg as carefully as the flight

With ASE closed, the aircraft lands an hour or more from the house. We track the tail number, stage vehicles at Rifle, Eagle or Grand Junction, time the drive around the canyon and have the residence ready, so the longer transfer is the only thing that changes. Private jet to Aspen.

Planning for someone else

Assistants, advisors and concierge teams

Send the dates, the airport your client is flying into and where they are staying. We handle the Aspen side on the ground, and you keep the relationship. Send the details.

Common questions

When is the Aspen airport closed in 2027?

From 11:00 p.m. on Sunday, April 4, 2027 until 7:00 p.m. on Friday, November 19, 2027, for a full runway reconstruction.

Can private jets still land in Aspen during the closure?

No. The airport has said no commercial or general aviation operations will be permitted while it is closed. Private aircraft typically use Rifle Garfield County (RIL), Eagle County (EGE) or Grand Junction (GJT).

What is the best airport to use instead of Aspen in 2027?

For airline travel, Eagle County (about 90 minutes) has the most added service. For private aircraft, Rifle is usually the best fit and avoids Glenwood Canyon. Denver has the most flights but is three and a half to four hours by road.

Will Glenwood Canyon construction affect the drive to Aspen?

Yes, from May through October 2027. CDOT is running head-to-head traffic between No Name and Hanging Lake and asks travellers to avoid Thursday and Friday afternoons westbound and weekday mornings eastbound. Routes from Eagle and Denver pass through the canyon; routes from Rifle and Grand Junction do not.

Will there be shuttles from other airports?

A community transportation committee is contracting ground transportation from regional airports for the closure; details are expected before it begins. We coordinate private transfers from any of the alternate airports.

Complete your 2027 arrival

During the closure Aspen Privé stays on the ground in Aspen. We coordinate transportation from the right alternate airport and build the residence, luggage, dining and the rest of the stay around the new arrival plan.

Discover more
Sources

Aspen/Pitkin County Airport: 2027 closure dates · ASE Modernization · Aspen Times: EGE summer 2027 flights · Aspen Daily News: Glenwood Canyon construction in 2027 · CDOT: Independence Pass · Rifle Garfield County Airport  — checked September 28, 2026.

Continue
Arriving in 2027

Send your dates.

Tell us when you're coming, who is travelling and how you plan to fly. We'll recommend the airport, time the drive around the canyon work and have the house ready when you arrive.

Plan my arrival
Paul Montiel  ·  Founder, Aspen Privé
+1 (970) 315-2060  ·  paul@aspenprive.com